San Antonio Permitting & Plan Review
Opening in San Antonio means getting approval from more than one office, in a particular order, before the first customer is served. The steps are not secret, but they live on several different websites and phone lines, and it is easy to do them out of order and lose weeks. FoodClout handles the health side of permitting and plan review for restaurants in San Antonio and Bexar County, remotely. We review your plans against the rules that apply to your address, assemble a complete submittal, and manage the process with the health department until your permit is issued.
We are owner’s-side consultants. We do not work for the health department and we do not sell equipment. Our job is to get your project approved without avoidable correction cycles.
First, the right authority for your address
In the San Antonio area the health authority is set by the address, not the mailing city, and picking the wrong one is the first way openings get delayed.
Inside San Antonio city limits: San Antonio Metropolitan Health District (Metro Health). Food Establishment Permit, renewed annually, purchased through Development Services once you hold a valid Certificate of Occupancy.
Unincorporated Bexar County: Bexar County’s Food Service Establishment program, with its own permit and plan review process. New businesses first submit a Certificate of Occupancy issued by the Bexar County Fire Marshal’s Office.
Independent cities in Bexar County, such as Alamo Heights and Balcones Heights: the city’s own health authority where one exists. Alamo Heights, for example, runs its own food establishment licensing and health inspection.
Anywhere with no local health program: Texas Department of State Health Services (DSHS).
We confirm jurisdiction before anything is paid or filed.
When plan review is required
A health review is conducted for any business that sells or serves food and drink, and it runs as part of the city's commercial plan review before a building permit is issued. Plans are needed for new construction, for remodeling a space that was never a food establishment, for changes to walls, floors or equipment, and when the scope of food service changes. A change of name or owner requires a new health license and inspection even when no new Certificate of Occupancy is required. The inspector makes the final decision, so we ask before assuming.
What we handle
Jurisdiction research and permit strategy. Before anything is filed, we map which permits your project needs, which agencies review it, and in what order, so the critical path is clear from day one.
Health plan review preparation. We review floor plans, equipment schedules, and finish schedules against San Antonio's requirements and flag what a reviewer will flag, before they see it. Health is a Metro Health discipline inside Development Services plan review, so the kitchen layout has to satisfy the health reviewer as part of the same submittal as the building, plumbing, mechanical, electrical, and fire reviews.
Submittal management. We assemble and file the commercial permit package through the BuildSA Customer Portal, the city's Accela system, uploading the plans and documents to the online Plan Room, and track it through the completeness review and the technical reviews. The food establishment permit itself is purchased through Development Services at the Cliff Morton Development and Business Services Center (One Stop), 1901 S. Alamo St., San Antonio, TX 78204. Food permits: 210-207-0135.
Corrections and resubmittals. Correction comments are normal. In BuildSA they arrive as Issues in the Plan Room. We interpret the comments, coordinate the responses with your architect, engineer, or contractor, and manage the resubmittal until the comments are cleared.
Health department coordination. We communicate with reviewers and inspectors on your behalf, line up the Certified Food Manager Metro Health requires on duty during hours of operation, and prepare you for the health inspection that sits inside the Certificate of Occupancy process. Every building, electrical, plumbing, mechanical, environmental, health, and fire inspection must be approved and recorded before the food establishment license is issued and the business may open.
The details San Antonio reviewers check first
Three-compartment utensil sink wherever food or beverages are prepared or multi-service utensils are used, with two integral drainboards, one on each side, and compartments and drainboards large enough to accommodate the largest utensil used. Handwashing facilities in each food preparation area, server station, and warewashing area, and within or next to toilet rooms, with hot and cold running water delivered under pressure through a mixing valve, plus cleanser and single-use towels or hot-air blowers in wall-mounted dispensers. Spray-type dish machines that sanitize with hot water need a booster heater, or an approved recirculation system, capable of holding the rinse water at not less than 180 degrees Fahrenheit. A janitorial or mop sink area for cleaning equipment and supplies: a non-porous mop sink, or a curbed slab or floor sloped to a drain, connected to approved sewerage, with hot and cold running water and a backflow device. A dumpster enclosure used as a cleaning facility must have hot and cold water and be curbed and sloped to drain into a sanitary sewer through a grease trap. Grease is its own track in San Antonio: the San Antonio Water System (SAWS) Fats, Oils and Grease program requires fixtures that can discharge grease to drain to a properly maintained interceptor, and a new establishment must have the interceptor in place before it discharges.
A note on San Antonio
In San Antonio the food permit comes last, on purpose. A valid Certificate of Occupancy must be presented at the time you purchase the food establishment permit, and the license is not issued until every required inspection, building, electrical, plumbing, mechanical, environmental, health, and fire, has been approved and recorded by Development Services. The permit is annual, and its fee is based on the gross annual volume of food sales. Sequence is the whole game here: health plan review early, inspections cleared in order, permit at the end.
A note on drawings
FoodClout reviews, prepares, and manages. Where a jurisdiction requires drawings sealed by a licensed architect or engineer, your design team provides the seal and we make sure the sealed set says what the health reviewer needs to see. Many projects stall because the health review was an afterthought in the design. We make it a first thought.
Opening in San Antonio? Book a free consultation and we will map your permit path before you file anything.